A pre-existing dormitory was converted into a multi-tenant office building. Drastic interventions were made, a multi-disciplinary team implemented the new design, working together. The project called for the reconsolidation and reconditioningĀ of theĀ building’s structure, the alteration of both exterior facades and interior floor plans, electrical infrastructure, sanitary, and HVAC system.